• About
  • Advertise
  • Subscribe
  • Contact
  • Events
Monday, July 20, 2026
Newsletter
SUBSCRIBE
  • News
    • Company news
    • People and appointments
    • Contracts awarded
  • Features
  • Critical minerals
    • Chromium
    • Cobalt
    • Lithium
  • Commodities
    • Alumina
    • Coal
    • Copper
    • Gold
    • Iron ore
    • Nickel
    • Oil and gas
    • Uranium
  • Smart mining
    • Industrial Automation
    • Big Data
    • Cyber Security
    • IOT
  • Events
    • WA Mining
    • QME
    • AIMEX
    • HVME
  • Sustainability
    • Circular economy
    • Environmental management
    • Mine rehabilitation
    • Energy efficiency
    • Water and waste management
  • Asset Management
    • Condition Assessment
    • Instrumentation, Control & Monitoring
    • Maintenance
No Results
View All Results
  • News
    • Company news
    • People and appointments
    • Contracts awarded
  • Features
  • Critical minerals
    • Chromium
    • Cobalt
    • Lithium
  • Commodities
    • Alumina
    • Coal
    • Copper
    • Gold
    • Iron ore
    • Nickel
    • Oil and gas
    • Uranium
  • Smart mining
    • Industrial Automation
    • Big Data
    • Cyber Security
    • IOT
  • Events
    • WA Mining
    • QME
    • AIMEX
    • HVME
  • Sustainability
    • Circular economy
    • Environmental management
    • Mine rehabilitation
    • Energy efficiency
    • Water and waste management
  • Asset Management
    • Condition Assessment
    • Instrumentation, Control & Monitoring
    • Maintenance
No Results
View All Results
Home Features

Powering a maintenance shift

by Staff Writer
April 30, 2026
in Asset Management, Commodities, Condition Assessment, Features, Maintenance
Reading Time: 5 mins read
A A
Cable drums holding industrial electrical cable, used for utility power distribution. Images: Australian Power Equipment

Cable drums holding industrial electrical cable, used for utility power distribution. Images: Australian Power Equipment

Share on FacebookShare on Twitter

As Australian mining operations electrify, proactive maintenance is changing from a back-of-house function into a vital strategic lever – and Australian Power Equipment is powering that shift.

As mining operations across Australia move to electrification and become more uptime-critical, maintenance is no longer a back-of-house function. In today’s environment, electrification is now a strategic lever that directly influences safety, production continuity, and long-term cost certainty, as well as providing an opportunity to improve environmental impacts.

For Australian Power Equipment (APE), as a leading low-, medium- and high-voltage power equipment provider, this shift reflects what many mine operators are already experiencing on site: traditional, reactive maintenance models are no longer fit for purpose in modern high-voltage environments.

“Maintenance of high voltage equipment has historically been treated as something you respond to when equipment fails,” APE co-director Andrew Cockbain said.

“But in today’s mining operations, failure isn’t just inconvenient, it’s a safety risk, a production risk, and a commercial risk.”

Australian Power Equipment founders Andrew Cockbain and Abby Crawford. Images: Australian Power Equipment

Electrical mining maintenance has traditionally focused on keeping assets running for as long as possible, often pushing aged infrastructure well beyond its original design intent. While this approach may have worked in the past, it exposes operations to increasing levels of unplanned downtime, compliance risk, and extended outages when replacement equipment cannot be sourced quickly.

Now, many operators are moving toward preventive and lifecycle-based maintenance strategies, looking not just at individual assets but at how entire power systems perform over time.

“At APE, we see maintenance as a system, not a service,” APE co-director Abby Crawford said. “It’s about understanding how substations, transformers, cables, accessories, and supporting infrastructure work together, and where the real operational risk sits across the lifecycle.”

This system-level approach enables operators to plan redundancy earlier through asset renewal, improve cost certainty, and align maintenance decisions with future power demand rather than past assumptions. It also enables consideration of how electrical equipment is powered, with APE offering FR3 fuelled equipment improving environmental outcomes.

Despite this shift, some of the highest-risk areas in mining power infrastructure remain consistently underestimated.

Cable systems and accessories, for example, are often viewed as static assets. In reality, they are exposed to mechanical handling, thermal loading, environmental conditions, and changes in duty that can significantly reduce service life if not actively managed. Another common risk is the ‘it’s still working’ mindset. Assets may remain operational while insulation systems degrade, protection technology becomes obsolete, or capacity no longer matches operational demand. Waiting until failure often removes flexibility, forcing urgent decisions, extended downtime, or compromised solutions.

“We regularly see infrastructure that’s been pushed well beyond what it was originally designed for,” Cockbain said. “By the time it fails, options are limited. The earlier you address those risks, the more control you have over safety, timing, and cost.”

A 2000 kVA distribution transformer designed for stepping down high voltage electricity. Images: Australian Power Equipment

The role of new equipment

A key part of modern maintenance planning is flexibility, and that flexibility increasingly comes from access to both new and refurbished equipment.

Refurbished high-voltage assets supplied by specialist providers can play a critical role in reducing maintenance burden, improving reliability, and extending asset life, particularly where lead times for new equipment are long.

“Refurbishment doesn’t mean compromise,” Crawford said. “When it’s done properly, refurbished equipment can be purpose-built for a site’s specific requirements, tested to current standards, and deployed far faster than many new builds. We also have new equipment in stock that can be quickly deployed.”

For many mining operations, refurbished equipment and hire solutions are also essential in managing unplanned events. Hired and refurbished assets can be deployed quickly to bridge an emergency gap while operations continue as new, site-specific equipment is engineered and delivered.

“Hire is often the difference between a short-term disruption and a prolonged outage,” Cockbain said. “It gives sites breathing room, particularly in remote locations where downtime costs escalate quickly.”

By combining new equipment for long-term needs, refurbished equipment for flexibility, and hire for contingency planning, operators can build resilience into their maintenance strategies rather than reacting under pressure.

Maintenance as risk management

Ultimately, modern maintenance is about risk management – not just asset preservation.

It requires understanding where failure would have the greatest impact, where safety exposure is highest, and where proactive intervention can deliver the greatest return. It also means recognising when replacement, refurbishment, or temporary hire is the most practical solution.

“Good maintenance asset planning gives operators options,” Crawford said. “It allows decisions to be made deliberately, not in crisis mode.”

As mining transitions toward electrification and increasingly complex power networks, maintenance strategies will only become even more important. The operations that perform best will treat maintenance as an integrated lifecycle function, which is supported by the right mix of new equipment, refurbished solutions, and responsive support.

Rethinking maintenance is no longer about keeping assets running at all costs. It’s about ensuring power systems are safe, reliable, environmentally responsible and fit for purpose, now and into the future.

This feature appeared in the Autumn edition of Australian Mining.

Related Posts

Island power generation is crucial for remote mining operations. Images: APE

The future of exploration requires future-ready power

by Staff Writer
July 16, 2026

Electrical infrastructure is moving from a late-stage consideration to an early project priority as exploration programs expand into remote regions....

Image: New Africa/shutterstock.com

Genesis and Vault merger diving into Australia’s new gold frontier

by Ethan Benedicto
July 16, 2026

Genesis Minerals and Vault Minerals have confirmed a binding Scheme Implementation Deed to merge, creating a company with roughly A$12.6...

Australia, Japan, and the US's FID alongside Alcoa's on its Wagerup gallium site in WA is a step forward in diversifying the critical minerals supply chain, with China currently supplying 98 per cent of the world's gallium supply. Image: vagon/stock.adobe.com

What does Alcoa’s Wagerup gallium FID mean for Australia?

by Ethan Benedicto
July 16, 2026

Alcoa and the Australian, US and Japanese governments have taken a final investment decision (FID) on a gallium project co-located...

Read our magazine

Join our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.


Mining has been developed to keep you up-to-date with all of the latest news, discussions, innovation and projects in the Australian mining sector. Our vision is that this hub will arm decision makers all over Australia with the critical information they need to be ahead of technologies and trends to improve operations and compete in an international market.

Subscribe to our newsletter

View our privacy policy, collection notice and terms and conditions to understand how we use your personal information.

About Mining Magazine

  • Home
  • About
  • Advertise
  • Contact
  • Digital Magazine
  • Subscribe
  • Events
  • Terms & Conditions
  • Privacy Collection Notice
  • Privacy Policy

Popular Topics

  • News
  • Spotlight
  • Projects
  • Critical minerals
  • Commodities
  • Sustainability
  • Exploration
  • Investment

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited

No Results
View All Results
NEWSLETTER
SUBSCRIBE
  • News
    • News
    • Company news
    • People and appointments
    • Contracts awarded
  • Features
  • Critical minerals
    • Critical minerals
    • Chromium
    • Cobalt
    • Lithium
  • Commodities
    • Commodities
    • Alumina
    • Coal
    • Copper
    • Gold
    • Iron ore
    • Nickel
    • Oil and gas
    • Uranium
  • Smart mining
    • Smart mining
    • Industrial Automation
    • Big Data
    • Cyber Security
    • IOT
  • Sustainability
    • Sustainability
    • Circular economy
    • Environmental management
    • Mine rehabilitation
    • Energy efficiency
    • Water and waste management
  • Asset Management
    • Asset Management
    • Condition Assessment
    • Instrumentation, Control & Monitoring
    • Maintenance
  • Events
    • AIMEX
    • WA Mining
    • QME
    • HVME
  • About
  • Advertise
  • Contact
  • Subscribe

© 2026 All Rights Reserved. All content published on this site is the property of Prime Creative Media. Unauthorised reproduction is prohibited